From the structure of the sleeve foundation the collar is precast executed; in the site it is vertically rotated by 180 degrees then the plate reinforcement it is connected on stubs and is assembled on position.
Removing the labor on site and concrete maturation time, the erection speed of the structure rise considerably.
Details